Colombo's Tallest Residential Towers.
Shotcrete Walls for the Altair Colombo Towers Project
Period September 2014 to March 2015.
Contract Sum:
Project Value US$ 2.0M
Colombo's Tallest Residential Towers.
Secant Pile Wall works for the Altair Colombo Towers Project
Period
December 2013 to August 2014.
Contract Sum:
Project Value US$ 6.0M
High Rise Residency Project
800mm, 1000mm & 1200mm Bored Piles
Period
September 2013 to June 2014.
Contract Sum:
Project Value US$ 4M
Contiguous Bored Piles (CBP) Wall Works for the proposed Shangri-La Hotel Development -
On lots 9132/1 & 9132/2 at Colombo Sri Lanka
Period
May 2012 to November 2012.
Contract Sum:
Project Value US$ 10.0M
1500 Sheet Piles and Basement Works 100,000 Cubic Meters of soil excavation.
Contract Sum:
Project Value US$ 3.0M
300 Nos of 1000mm Bored cast in-situ Piles
for 34 Level Apartment.
Contract Sum:
Project Value US$ 800,000
Piling Works for NDB Building.
Contract Sum:
Project Value Rs.30,134,000/-
(US$ 371,500/-)
Piling Works for Mercantile House.
Contract Sum:
Project Value Rs.26,000,000/-
(US$ 372,000/-)
100,000 CBM soil excavation / Retaining Wall.
Contract Sum:
Project Value Rs.35,000,000/-
(US$ 500,000/-)
Foundation Piling Works.
Contract Sum:
Project Value Rs.26,956,636/-
(US$ 337,000/-)
500 no Piles of 600mm and 900mm diameter.
Contract Sum:
Project Value Rs.148,990,500/-.
3 Test Piles and Load Testing
Contract Sum:
Project Value Rs.4,000,000/- approx.
US$ 36,370/-
2 Test Piles and Load Testing, PTA and PDA Tests
Period – January – February 2007.
Contract Sum:
Project Value Rs.5,900,000/-
US$ 55,150/-
Piling Works for Setmil Development project
Period - 2-1/2 months from 16/6/2006
Contract Sum:
Project Value Rs.65,287,232/50
US$ 646,408/-
Piling Works for bridges in Wakwella, Galle -
Reconstruction of bridges affected by tsunami.
Contract Sum:
Project Value Rs.20,000,000/-
US$ 198,000/-
CBP, excavation, dewatering, grouting etc.
Period – Mid June 2006 to December 2006
Contract Sum:
Project Value Rs.221,436,739/-
US$ 2,170,948/-
Piling works – Dockyard
No 2 Dock entrance widening & Construction of
crane rail projects
Period – 21/9/2005 – December 2005
Contract Sum:
Project Value Rs. 20,987,000/-
Piling Contract –
1800mm dia piles for "Mayfair City" project
Period – 01/09/2005 to 10/2/2006
Contract Sum:
Project Value Rs.212,000,750/-
US$ 2,120,000/-
Piling Contract – 634 Nos 800mm dia Piles for
Flour Mill at Prince Vijaya Quay, Colombo Port.
(Principals in Dubai – ETA)
With special machinery brought in addition to our
machinery under the direction of the Consultants to
the client the balance piling work is proceeding .
7 November 2003
Contract Sum:
Project Value 800 Piles under normal soil conditions –
US$ 4.0 Million final cost approx. Rs.125,000,000/- (US$ 1,190,500/-)
Piling Contract – 40 Piles
For Office Building
Pile Capping
12 July 2003
Contract Sum:
Project Value Rs.4.0Million
(US$ 43,500/-)
Piling completed in
Ten days.
Piling Contract – 118 Piles
For Apartment Complex
Pile Hacking
12 June 2003
Contract Sum:
Project Value Rs.11.5Million
(US$ 125,000/-)
Piling Contract – For construction of Warehouse at
Kelaniya
77 Nos Piles
29 March 2002
Contract Sum:
Project Value Rs.9.35Million
(US$ 101,630/-)
Piling completed in
September 2002
Piling Contract - 1250 Piles For Construction of
168.1 MW Diesel Fired Combined Cycle Power
Plant for AES Kelanitissa Private Limited
Pile Hacking
27 March 2001
Contract Sum:
Project Value Rs.145,910,000/-
Material supplied by
the Client
(US$ 1,620,000/-)
Piling completed on 30
November 2001
Piling - 198 Nos
LOAD TEST – 2 initial load tests for 600 and
1,000mm dia piles. 900MT and 350MT loads were
applied respectively on 1,000mm and 600mm dia
piles. Two routine load tests on 600mm and
1,000mm dia piles were carried out.
6 June 2000.
Contract Sum:
Project Value Rs.22,000,000/-
(US$ 45,000/-)
No.60 Baseline Road, Colombo 8
Piling LOAD TEST – Two (2) Compressive
Ultimate Load Tests using 4 anchor piles were carried out. Load applied 550 MT.
18 October 1999
Contract Sum:
Project Value Rs.15,300,000/-
Machinery and labour
only
(US$ 170,000/-)
No.3 Park Place, Colombo 5
Piling for 3 Storied residence
17 February 1999
Contract Sum:
Project Value Rs.3,500,000/-
Piling completed on 16
March 1999
(US$ 43,750/-)
Pile Foundation LOAD TEST – 450 and 650MT
Load Tests using kentledge have been carried out
18 October 1998
Contract Sum:
Project Value Rs.9,957,000/-
(Machinery and
labour only)
(US$ 120,000/-)